![]() ![]() The tram was the first that was suited for the large-floor area and 42 trams have been delivered to the BOGESTRA in 1992. ![]() In contrast to many other trams it doesn’t ride on the normal railway but on the for the Ruhr district typical meter-gauge tracks. Maximum speed of the tram is 70 km/h and allows to transport 171 people at max. It uses three-phase drive and is 28,6 meters long and 2,3 meters wide. The add-on Tram Essen/Gelsenkirchen offers a lot of new possibilities for the world of OMSI.įocus of the add-on is the tram NF6D (MGT6D) that was developed in Kassel in 1988. That way the virtual tram driver has an authentic driving experience and has to always keep track of his surroundings. The route is partly with other traffic and without and creates a high amount of diversity. We will reward you with extended content (trams, trolleybuses, multiple lines, vehicles and other functions and content). A total of 1,798 KT4 wagons of various modifications were built, many of which were later upgraded. Produced JSC CKD Tatra Prague Smichov from 1973 to 1997. 15 tram stops (two of those subway stops) through challenging alleys from Essen to the broader streets of Gelsenkirchen.Ī depot and the underground point of return round up the scenery nicely. Czechoslovak two-section articulated four-axle one-way tramway with rheostat-contactor or thyristor-pulse control system. OMSI 2 premiere – Get on rails in the popular bus simulation at the Ruhr district for the first time.
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |